 |
|
Detroit Water & Sewer Department
|
|
Clinton Township, Michigan
|
|
|
|
METCO's Relevent Experience: |
• Horizontal and Vertical Control Survey
• Construction Layout
• Establish Property lines
• Stake and grade bore pit locations at two Clinton River crossings, I-94 crossing and railroad crossing
|
|
|
|
|
|
42" Watermains for DWS-605 and DWS-606
|
 |
METCO Services Inc. was responsible for providing control and construction layout services. These improvements included:
• Establishing Horizontal & Vertical for over 32,000 linear feet (6 miles) of 42” watermain.
• Stakeout 42” watermain at +/-100 sta. with direct relation to right-of-way lines that needed to be determined.
• As-Built 42” watermain and existing ground surfaces prior to construction for replacement purposes.
|
|
|