Detroit Water Partners/DLZ, Inc.
|
|
Detroit, Michigan
|
|
|
|
METCO's Relevent Experience: |
Study and Design of:
· Electrical Secondary Power Distribution
System for Pump Station, Rack and Grit
Building and New Off-Load Facility.
· Lighting System Upgrade
· Instrumentation and Control System for
Primary Effluent Pumps, Grit Collectors,
Bar Rakes, Grit and Screening Conveyors
and Screening Off-Load Conveyors.
Construction Related Services including:
· Shop Drawing Review
· RFI Responses
· Change Order Reviews
· Start-up and Testing
|
|
|
|
|
|
Pump Station No. 1 Rehabilitation - Detroit Wastewater Treatment Plant
|
 |
DWP had recommended the upgrading of the existing Pump Station No. 1 to enhance its capacity to handle the ultimate flow of 1700 MGD Raw Sewage at a total construction cost of approximately $22.0 Million.
The major items of improvements include the following:
• Rehabilitation of Influent Pumping Units.
• Replacement of Electrical System associated
with the Pumping Units.
• Rehabilitation of Rack and Grit Removal and
Handling System.
• Construction of new Screening Off-Load
Facility.
• Upgrading of Electrical Distribution System
at Pump Station and Rack and Grit Building.
• Upgrading of Lighting System at Pump
Station and Rack and Grit Building.
• Process Instrumentation and Control System
for Pump, Rack and Grit Removal and
Conveyance System and Screening Off-Load
System.
|
|
|