Detroit Water and Sewerage Department (DWSD)
|
|
Water Works Park WTP, Northeast WTP, Franklin Pumping Station,
|
|
|
|
METCO's Relevent Experience: |
Provided Engineering Services including:
• “Design-Build” RFP Preparation including
development of project scope, general
layout and technical specifications
• Participate in round-table workshop with
proposers.
• Bid Evaluation & Contract Design
• Construction Administration Services
as ‘Oversight’ Consultant to DWSD
including:
• D/B Contract Coordination (including
field activity)
• Technical Services (Submittal Review,
RFI Response & Change Order Review)
• Resident Engineering Services
• D/B Contractor Progress Payment
Review
• Construction Administration Services
• Quality Assurance
• Start-up and Testing Services
• Project Close-out Services
• As Needed Design Engineering Services
|
|
|
|
|
|
Design-Build Contract – Power System Enhancements – New Generator System
|
 |
Subsequent to statewide power outage in August of 2003, DWSD has decided to install Emergency Generator System at their four (4) additional facilities to insure adequate water supply to all their customers during emergency situations.
The Design-Build project DWS-837A is intended to accomplish the above objective. The scope and major elements of this D/B Project include:
• Furnish and install diesel generator system
consisting of 2-MW Generators at Water Work
WTP, Northeast WTP, Franklin Pumping
Station and Clintondale Sewage Pumping
Station.
• Interface the new generator system
with ‘Ovation’ System for remote operation
and monitoring of the generators.
METCO was retained as ‘Oversight Consultant’ to (a) prepare proposal documents for ‘Design-Build’ of this Project; and (b) provide Oversight Consulting Services during construction.
|
|
|