Detroit Water and Sewerage Department (DWSD)
|
|
Various locations within Southeast Michigan
|
|
|
|
METCO's Relevent Experience: |
Provided Engineering Services including:
• “Design-Build” RFP Preparation including
development of project scope, general
layout and technical specifications
• Participate in round-table workshop with
proposers.
• Bid Evaluation & Contract Design
• Construction Administration Services
as ‘Oversight’ Consultant to DWSD
including:
• D/B Contract Coordination (including
field activity)
• Technical Services (Submittal Review,
RFI Response & Change Order Review)
• Resident Engineering Services
• D/B Contractor Progress Payment
Review
• Construction Administration Services
• Quality Assurance
• Start-up and Testing Services
• Project Close-out Services
• As Needed Design Engineering Services
|
|
|
|
|
|
Design-Build Contract – Power System Enhancements – Modifications to Existing Generators
|
 |
To address the potential Y2-K power outage, DWSD has installed forty-three (43) generators of 2 MW capacity each, at thirteen (13) of their facilities including Water Treatment Plants, Water Pumping Stations and Sewerage Pumping Stations.
These systems were provided under Contract DWS-828 in the year 1999, was needed to upgrade and incorporate additional flexibility in the operation as well as for remote monitoring and control of their system.
To implement the required modifications to the existing system, DWSD initiated a Design/Build Contract DWS-837B with the following scope and major project elements:
• Modify the existing generator control
system to interface with ‘Ovation’ System
for remote control and operation of the
generators.
• Replace the existing Medium Voltage
Switchgear line-up at two facilities.
• Furnish and install new ‘Ovation’
workstation for DWSD Maintenance Division
for use at their Central Services Facility.
• Modify the existing control system to
enable the generators to feed all sections
of the plan main electrical bus.
METCO was retained as ‘Oversight Consultant’ to (a) prepare proposal documents for ‘Design-Build’ of this Project; and (b) provide Oversight Consulting Services during construction.
|
|
|