Metcalf & Eddy/Detroit Water and Sewerage Department
|
|
Detroit, Michigan
|
|
|
|
METCO's Relevent Experience: |
Study and Design Services:
• Electrical Power System Design at Medium
Voltage (5KV) level
• 2500 HP Synchronous Motor System
• Medium Voltage VFD System
• I&C System for Control and Monitoring of
Pumps
• HVAC Control System for VFD – Electrical
Room
Construction Related Services:
• Shop Drawing Review
• RFI Responses
• Change Order Evaluation
• Start-up and Testing
|
|
|
|
|
|
Replacement of Intermediate Lift Pumps No. 1 & 2 - Detroit Wastewater Treatment Plant
|
 |
In order to insure enhanced level of reliability to the Secondary Treatment Process, DWSD had proposed to replace the existing Intermediate Pumping Units No. 1 and No. 2, with new Pumps, Motors and state-of-art Variable Frequency Drives for a total construction cost of approximately $9.0 Million.
The major improvements include the following:
• Installation of Two (2) 350 MGD Vertical
Propeller Pumps.
• Installation of Two (2) 2500 HP Brushless
Synchronous Motors at 4160V service level.
• Installation of Two (2) 2500 HP, 4160V, 24
Pulse Width Modulated Variable Frequency
Drives.
• One (1) new Electrical Building to house
the VFD System.
• PLC based Process Control System to control
and monitor the Pumping Units and the VFD
System.
|
|
|