Home About Us Our Services Projects News & Events Job Opportunities HDS Website
Client:
City of Warren
Location:
Warren, Michigan
METCO's Relevent Experience:
Study and Design Services include:

   ·  Sludge Thickening and Disposal
      System

   ·  Gravity Belt Thickener

   ·  Aeration Blower System

   ·  Ceramic Fine Bubble Diffuser System

   ·  Filter Press Rehabilitation

   ·  Roof Replacement

   ·  Multi-Hearth Incinerator Upgrade/
      Refurbishing

Construction Administration Services include:

   ·  Shop Drawing Review

   ·  Response to RFI's

   ·  Change Order Review

   ·  Periodic Field Visit for Compliance

   ·  Start-up and Testing
Critical Improvement Projects - City of Warren Wastewater Treatment Plant
City of Warren identified key improvements to their dewatering, sludge handling and incineration system to be designed and constructed under their Short-Term Capital Improvements projects.

METCO was retained to develop a suitable conceptual design reflecting the intent of City of Warren to develop detailed design and contract documents and provide construction administration services including resident engineering services to insure timely implementation.

The major projects identified under their Capital Improvement Program include:

   •  Rehabilitation of the existing two (2) Belt
      Filter Presses

   •  Install One (1) new Gravity Belt Thickener

   •  Install new Ceramic Disc Fine Bubbler
      System for Three (3) Aeration Tanks

   •  Refurbish the Incinerator System including:

        o  Replace refractories
        o  Replace the feeder system
        o  Modify central shaft drive
        o  Provide new scrubber trays
        o  Miscellaneous Improvements

   •  Major Incinerator Improvements include:
        o  New I.D. Fan
        o  New Combustion Air Blowers
        o  New Burner Trains for Seven (7)
           Hearths and new Gas Main
        o  New Main Incinerator Control Panel
        o  New Ash Grinder System

   •  New 8,000 sft Maintenance Building

   •  Replace roof for Eight (8) buildings

   •  Removal and abatement of Asbestos at
      various facilities

Engineering

Architecture

Surveying

High Definition Surveying


  Engineering
Connors Station and Fox Creek Backwater Gate Rehabilitation
Design-Build Contract for Haggerty Pump Station
Baby Creek CSO Control Facility
The Replacement of Three Variable Frequency Drives at the Detroit WWTP's Intermediate Lift Pump Station #2
Wayne County Parks Five Year Capital Improvement Program
Design-Build of Improvements to North Service Center Water Booster Station
Aeration Basin Conversion & Improvements Project - Detroit Wastewater Treatment Plant
Sewage Meter Pit Improvements
Pump Station No. 1 Rehabilitation - Detroit Wastewater Treatment Plant
Design-Build Contract for Emergency Generator at Thirteen (13) DWSD Facilities
Electrical Power System Study - Detroit Wastewater Treatment Plant
River East Infrastructure Improvements – City of Detroit
Electrical System Improvements - Detroit Wastewater Treatment Plant
Sanitary Sewer Review Assessment and Improvement Program – East Trunk Sewer System – City of Warren
Design-Build Contract – Power System Enhancements – New Generator System
Sanitary Sewer Program
Design-Build Contract – Power System Enhancements – Modifications to Existing Generators
Watermain Improvement Program – Phase VI
Replacement of Intermediate Lift Pumps No. 1 & 2 - Detroit Wastewater Treatment Plant
City-Wide Watermain Replacement Program – City of Detroit
Lorraine Sanitary Relief Sewer – City of Warren
Water Works Park II Design/Build/Maintain Project
Critical Improvement Projects - City of Warren Wastewater Treatment Plant
Schoolcraft Pump Station Improvements
Design/Build of Communication, Security Lighting & Computer Center
Wick Road Pump Station Rehabilitation
Franklin Pump Station Improvements


  Architecture
Jayne-Lasky - Family Fun Center
Northville - The New Victorian
Warren Community Center
Light Industrial / Office Buildings
Rochester Hills - Boulevard Office


  Surveying
Campus Martius
Victoria Park Subdivision
Waterfront Reclamation and Casino Development Project
Water Works Park
Comerica Park
Ambassador Gateway
Warren City Center Infrastructure Improvement
City of Detroit - Wastewater Treatment Plant
Detroit City Airport
Ford Field
Detroit Public Schools
Jefferson Village
Detroit River Tunnel Project
Ambassador Gateway
42" Watermains for DWS-605 and DWS-606
Baby Creek CSO
Surveying Services


  High Definition Surveying
Conner Creek Pump Station
Ambassador Gateway - Former Michigan Central Railroad
New Baltimore Water Treatment Facility
HMM Axle Plant
Corporate Office
1274 Library, Suite 400
Detroit, Michigan 48226
(313) 961 - 4560
(313) 961 - 1698 - Fax
Branch Office
12504 Stephens
Warren, Michigan 48089
(586) 755 - 5770
(586) 755 - 5774 - Fax
Branch Office
23917 Cass Street
Farmington, Michigan 48335
(248) 478 - 3423
(248) 478 - 5656 - Fax
Branch Office
301 Clematis St., Suite 3129
West Palm Beach, Florida, 33401
(561) 802 - 4130
(561) 802 - 4131 - Fax
Home |  About Us |  Our Services  |  Projects |  News & Events
Jobs |  Contact Metco  |  Privacy Policy
©2005-2007 Metco Services