Detroit Water & Sewerage Department
|
|
Detroit, Michigan
|
|
|
|
METCO's Relevent Experience: |
• Develop detailed Design Drawings
• Code Compliance and Permit Procurement
• Field – Design Coordination
• Field Inspection and Quality Control
• Submittal Review and Coordination
• Record Drawings Preparation
|
|
|
|
|
|
Design/Build of Communication, Security Lighting & Computer Center
|
 |
To house all macro computer equipment to support the Master Water Meter billing system for various communities, a Computer Center with a floor area of approximately 15,000 sft was constructed at DWSD Central Service Facility at Huber.
METCO, as the Lead Design Engineer of Project DWS-808 was responsible to provide the following Engineering Services during the Design and Construction Phase of this Facility.
• Architectural Engineering for the facility
including layout of main computer room,
conference room, work station/work area etc.
• Structural Engineering
• Electrical Power Distribution and UPS System
• Data Communication System
• Mechanical Plumbing and Piping
• Heating and Ventilation System
• Fire Protection System include FM-200 Fire
Suppression System
|
|
|