|
Study & Design Services:
• Provided Design, Construction
Administration Start-up and Testing Services
• Successfully completed the project within
budgeted time and cost
• Designed and installed SCADA System for
remote (System Control Center) control and
operation of pumps
• Upgraded existing SCADA at DWSD System
Control Center to include five (5) more
Water Booster Stations
|