Home About Us Our Services Projects News & Events Job Opportunities HDS Website
Client:
Sumpter Township
Location:
Sumpter, Michigan
METCO's Relevent Experience:
   ·  Topographic Survey

   ·  Public Hearing

   ·  Design and preparation of Plans and
      Specifications

   ·  Construction Engineering

   ·  Field Inspection

   ·  Citizen Complaint Resolution
Sanitary Sewer Program
Sumpter Township had embarked on an ambitious Sewer Development Program with the objective of providing sanitary sewer facility to all its citizens.

METCO was hired to design and manage the construction of the program. The program was divided into three distinct phases, so as to accommodate the availability of funds.

Under Phase I, METCO has provided Construction Engineering Services including Resident Inspection and Contract Administration for the construction of approximately 2.2 miles of gravity sewer with sizes ranging from 10” – 26” and 800 lft. of 8” force main with pump station at total cost of $2.5 million.

Severe ground pollution was one of the major problems encountered during construction and METCO provided on-site solutions and also assisted the Township Administration in addressing the citizen complaints.

Phase II of this program consisted of approximately 9 miles of gravity sewers with sizes ranging from 10” – 18” with six (6) lift stations. The scope of services for METCO included:

   ·  Topographic Survey
   ·  Negotiation with YUCCA for sewer capacity
      issue
   ·  Complete design and preparation of
      construction documents
   ·  Permit procurement from MDEQ.

METCO completed all the above tasks and construction of this project was put on ‘hold’ due to pending litigations issues with some members of the community.

Phase IIA consisted of 9.5 miles of low-pressure force main with two pump stations. Also included is installation of about 400 grinder pumps inside the residential homes. The unique feature of this project is the utilization directional drilling method to construct the force main and residential service leads from the grinder pumps.

This Phase is still under construction and METCO’s responsibilities include providing construction administration and field inspection services.

Engineering

Architecture

Surveying

High Definition Surveying


  Engineering
Connors Station and Fox Creek Backwater Gate Rehabilitation
Design-Build Contract for Haggerty Pump Station
Baby Creek CSO Control Facility
The Replacement of Three Variable Frequency Drives at the Detroit WWTP's Intermediate Lift Pump Station #2
Wayne County Parks Five Year Capital Improvement Program
Design-Build of Improvements to North Service Center Water Booster Station
Aeration Basin Conversion & Improvements Project - Detroit Wastewater Treatment Plant
Sewage Meter Pit Improvements
Pump Station No. 1 Rehabilitation - Detroit Wastewater Treatment Plant
Design-Build Contract for Emergency Generator at Thirteen (13) DWSD Facilities
Electrical Power System Study - Detroit Wastewater Treatment Plant
River East Infrastructure Improvements – City of Detroit
Electrical System Improvements - Detroit Wastewater Treatment Plant
Sanitary Sewer Review Assessment and Improvement Program – East Trunk Sewer System – City of Warren
Design-Build Contract – Power System Enhancements – New Generator System
Sanitary Sewer Program
Design-Build Contract – Power System Enhancements – Modifications to Existing Generators
Watermain Improvement Program – Phase VI
Replacement of Intermediate Lift Pumps No. 1 & 2 - Detroit Wastewater Treatment Plant
City-Wide Watermain Replacement Program – City of Detroit
Lorraine Sanitary Relief Sewer – City of Warren
Water Works Park II Design/Build/Maintain Project
Critical Improvement Projects - City of Warren Wastewater Treatment Plant
Schoolcraft Pump Station Improvements
Design/Build of Communication, Security Lighting & Computer Center
Wick Road Pump Station Rehabilitation
Franklin Pump Station Improvements


  Architecture
Jayne-Lasky - Family Fun Center
Northville - The New Victorian
Warren Community Center
Light Industrial / Office Buildings
Rochester Hills - Boulevard Office


  Surveying
Campus Martius
Victoria Park Subdivision
Waterfront Reclamation and Casino Development Project
Water Works Park
Comerica Park
Ambassador Gateway
Warren City Center Infrastructure Improvement
City of Detroit - Wastewater Treatment Plant
Detroit City Airport
Ford Field
Detroit Public Schools
Jefferson Village
Detroit River Tunnel Project
Ambassador Gateway
42" Watermains for DWS-605 and DWS-606
Baby Creek CSO
Surveying Services


  High Definition Surveying
Conner Creek Pump Station
Ambassador Gateway - Former Michigan Central Railroad
New Baltimore Water Treatment Facility
HMM Axle Plant
Corporate Office
1274 Library, Suite 400
Detroit, Michigan 48226
(313) 961 - 4560
(313) 961 - 1698 - Fax
Branch Office
12504 Stephens
Warren, Michigan 48089
(586) 755 - 5770
(586) 755 - 5774 - Fax
Branch Office
23917 Cass Street
Farmington, Michigan 48335
(248) 478 - 3423
(248) 478 - 5656 - Fax
Branch Office
301 Clematis St., Suite 3129
West Palm Beach, Florida, 33401
(561) 802 - 4130
(561) 802 - 4131 - Fax
Home |  About Us |  Our Services  |  Projects |  News & Events
Jobs |  Contact Metco  |  Privacy Policy
©2005-2007 Metco Services