Home About Us Our Services Projects News & Events Job Opportunities HDS Website
Client:
R.W. Armstrong
Location:
Detroit, Michigan
METCO's Relevent Experience:

   ·  Advise Clients on Street and Alley Vacation
      Issues

   ·  Boundary Survey

   ·  Topographic Surveys

   ·  Construction Layout

Detroit City Airport
METCO Services Inc. was responsible for providing Topographic & Boundary Surveys along with Construction Stakeout.  These improvements included:

   •  Establish Horizontal & Vertical Control
      around the entire 265 Acres of the Detroit
      City Airport.

   •  Establish boundary for the entire site.  
      Establish and create boundary surveys for
      15 adjoining blocks to be used for
      potential future expansion.

   •  Perform Topographic Survey of various areas
      within the about 265 acres for runway and
      taxiway rehabilitation and for the Runway
      Safety Areas.

   •  Perform construction layout across the site
      for runways, taxiways and onsite utilities.

   •  Wrote Legal Descriptions for lot splits.

Engineering

Architecture

Surveying

High Definition Surveying


  Engineering
Connors Station and Fox Creek Backwater Gate Rehabilitation
Design-Build Contract for Haggerty Pump Station
Baby Creek CSO Control Facility
The Replacement of Three Variable Frequency Drives at the Detroit WWTP's Intermediate Lift Pump Station #2
Wayne County Parks Five Year Capital Improvement Program
Design-Build of Improvements to North Service Center Water Booster Station
Aeration Basin Conversion & Improvements Project - Detroit Wastewater Treatment Plant
Sewage Meter Pit Improvements
Pump Station No. 1 Rehabilitation - Detroit Wastewater Treatment Plant
Design-Build Contract for Emergency Generator at Thirteen (13) DWSD Facilities
Electrical Power System Study - Detroit Wastewater Treatment Plant
River East Infrastructure Improvements – City of Detroit
Electrical System Improvements - Detroit Wastewater Treatment Plant
Sanitary Sewer Review Assessment and Improvement Program – East Trunk Sewer System – City of Warren
Design-Build Contract – Power System Enhancements – New Generator System
Sanitary Sewer Program
Design-Build Contract – Power System Enhancements – Modifications to Existing Generators
Watermain Improvement Program – Phase VI
Replacement of Intermediate Lift Pumps No. 1 & 2 - Detroit Wastewater Treatment Plant
City-Wide Watermain Replacement Program – City of Detroit
Lorraine Sanitary Relief Sewer – City of Warren
Water Works Park II Design/Build/Maintain Project
Critical Improvement Projects - City of Warren Wastewater Treatment Plant
Schoolcraft Pump Station Improvements
Design/Build of Communication, Security Lighting & Computer Center
Wick Road Pump Station Rehabilitation
Franklin Pump Station Improvements


  Architecture
Jayne-Lasky - Family Fun Center
Northville - The New Victorian
Warren Community Center
Light Industrial / Office Buildings
Rochester Hills - Boulevard Office


  Surveying
Campus Martius
Victoria Park Subdivision
Waterfront Reclamation and Casino Development Project
Water Works Park
Comerica Park
Ambassador Gateway
Warren City Center Infrastructure Improvement
City of Detroit - Wastewater Treatment Plant
Detroit City Airport
Ford Field
Detroit Public Schools
Jefferson Village
Detroit River Tunnel Project
Ambassador Gateway
42" Watermains for DWS-605 and DWS-606
Baby Creek CSO
Surveying Services


  High Definition Surveying
Conner Creek Pump Station
Ambassador Gateway - Former Michigan Central Railroad
New Baltimore Water Treatment Facility
HMM Axle Plant
Corporate Office
1274 Library, Suite 400
Detroit, Michigan 48226
(313) 961 - 4560
(313) 961 - 1698 - Fax
Branch Office
12504 Stephens
Warren, Michigan 48089
(586) 755 - 5770
(586) 755 - 5774 - Fax
Branch Office
23917 Cass Street
Farmington, Michigan 48335
(248) 478 - 3423
(248) 478 - 5656 - Fax
Branch Office
301 Clematis St., Suite 3129
West Palm Beach, Florida, 33401
(561) 802 - 4130
(561) 802 - 4131 - Fax
Home |  About Us |  Our Services  |  Projects |  News & Events
Jobs |  Contact Metco  |  Privacy Policy
©2005-2007 Metco Services