Haggerty Pumping Station Improvements

To ensure reliable water supply to the northwest communities of Oakland County, Detroit Water and Sewerage departments (DWSD) had proposed to construct a new water pumping station with a firm capacity of 70 MGD, and a 10 MGD reservoir under Design-Build project delivery system. METCO was retained by DWSD as their ‘Oversight Consultant’ to prepare proposal documents for Design/Build and to provide Oversight Consulting Services during the Design and Construction phases of this project. The major elements of this project include: - Land Acquisition Assistance - MDEQ permit procurement - Approximately 12,000 S.F. of pumping station - New three (3) line pumps and two (2) reservoir pumps - 10 million Gallon, above ground, precast concrete reservoir - Three (3) 800 HP, medium voltage pulse width modulated Variable Frequency Drives - 3,000 L.F. of 16-inch water main extension - New two (2) - 13.6 KV DTE power feed - 5 MVA Primary power substation for the new facility Complete ‘Ovation’ based control system for remote/local control and monitoring of the pump station Permitting procurement assistance The project was completed, and the pump station was put into regular operation with no major cost overruns.